Pages

Instagram

Friday, 3 May 2013

Melihat Proses Pembuatan Kapal

ABRAHAM

ABT 18,500 DWT ON 9.400M
BLT 10/2007 P.T. PAL INDONESIA -SU
BV SS 10/2007
147.35M LOA X 22.50M BRDTH/12.870M DEPTH
4 HO 4 HA MACGREGOR
22,072 CBM GRAIN
CATERPILLAR MOTOREN ROSTO, MAK (6M43C) 8158 BHP
12,5 KNOTS ON 21 MTS. IFO 180
CR 3X40TS
BOW THRUSTER AND SHAFT GENERATOR FITTED.
DOUBLE SKIN

WILL CALL GIBRALTAR FOR BUNKER SUPPLY 26.09.2009 AM, THEN SHE WILL
PROCEED TO MONROVIA/LIBERIA. ETA 04.10.2009, ETC:14-15.10.200




desain:



desain:



desain:



Uji Hidrodinamika replika kapal












Bahan Baku Kapal

bahan: 












material:










Pengelasan Material









Las Plasma:



 Las Plasma:


Proses Fabrikasi Material

fabrikasi:










Proses Assembly / Perakitan


































































Launching



















0 comments:

Post a Comment

 
MMORPG Games - MMORPG List - Video Game Music